Frequently asked questions

Here you will find answers to the most frequent questions about fish passes and the Fishcon lock. Your question is not listed? We are happy to help you personally.

General

A fish pass restores the connectivity of a flowing water body at weirs, hydropower plants, flood-protection structures or other transverse barriers. It allows fish and other aquatic organisms to overcome the obstacle safely.

A basic distinction is made between near-natural solutions - such as bypass channels, ramps or near-natural pool passes - and technical solutions such as vertical-slot passes, fish locks or fish lifts.

Transverse structures such as flood-protection works or hydropower plants can interrupt the natural migration of fish and other aquatic organisms. A fish pass creates a passable route between the tailwater and the headwater.

To achieve this, flow velocity, turbulence, water depth, dimensions and the position of the entrances and exits in particular must be adapted to the fish species present.

In classic pool or vertical-slot passes the head difference is overcome across several steps. Fish locks and fish lifts, by contrast, overcome the head difference over a much shorter distance and are therefore especially suitable where space is limited.

„Fish ladder“ is a common term for fish-ascent facilities in which a larger head difference is divided into several smaller steps - for example pool passes and vertical-slot passes.

The fish swim from pool to pool in the upstream direction. A functioning downstream passage often requires additional measures, because descending fish do not always reliably find the headwater-side entrance of a classic fish ladder. A very large space requirement as well as greater construction and maintenance effort frequently go hand in hand with these systems.

Fish ascent refers to migration in the upstream direction - for example towards spawning, feeding or refuge areas. Fish descent describes migration in the downstream direction.

Many classic fish passes are designed primarily for ascent and are therefore often referred to as fish-ascent facilities. The Fishcon lock is designed so that, with suitable positioning, it can be used for both ascent and descent.

The Fishcon lock

All three terms describe the same technology.

In scientific publications and during the development phase the terms „two-chamber fish pass“ and „two-chamber organism pass“ were mainly used. The Austrian guideline for the construction of fish-ascent facilities also uses the term „two-chamber fish pass“ for our fish pass. Today the technology is offered predominantly under the product name Fishcon lock.

The Fishcon lock consists of two hydraulically connected lock chambers. While one chamber is open to the tailwater, the second chamber is open to the headwater. Fish and other aquatic organisms can therefore enter the facility from both sides at the same time.

After a defined time interval the closure elements change their position. The chamber previously open to the tailwater is opened towards the headwater and vice versa. The organisms can then leave the chambers in their direction of migration.

A continuous attraction flow supports the findability and passability of the facility. A throttle device or turbine limits the discharge and ensures suitable flow conditions. The chambers remain completely filled with water during operation.

The closure elements are usually driven hydraulically.

Yes. With a suitable arrangement the Fishcon lock enables both fish ascent and fish descent.

Decisive for descent is a headwater-side connection that is easy to find. It should be arranged as close as possible to the main flow and to the migration obstacle so that descending fish are reliably guided to the lock.

At hydropower plants the descent planning must be considered together with the required fish protection. Depending on the site, screen, guidance or bypass systems may be necessary, for example. Fishcon is happy to assist with the site-specific design.

Yes. Biological functionality has been demonstrated at several completed facilities through independent monitoring studies. In video-monitoring studies both fish ascent and fish descent of different species and size classes could be documented.

The studies were carried out in accordance with the respectively applicable national requirements and recognised technical assessment methods.

We are happy to make the available monitoring reports and site-specific results available on request.

Use of the Fishcon lock has already been demonstrated for numerous fish species and different size classes. These include both strong swimmers and weaker-swimming, bottom-oriented and near-bed migrating species as well as shoaling fish.

Previous studies have documented brown trout, grayling, huchen, barbel, nase, perch, pike, bullhead, pikeperch and many other species. Both ascent and descent could be observed.

We are happy to provide the current total number of documented species as well as site-specific monitoring reports on request.

Application and planning

The suitable solution depends on the ecological, hydraulic, structural and economic conditions of the site.

Near-natural channels or pool passes can be good solutions where sufficient space and suitable topography are available. Vertical-slot passes are proven technical fish-ascent facilities, but depending on the head difference they require a correspondingly long structure, which can also lead to high costs.

The Fishcon lock offers particular advantages when little space is available, a larger head difference has to be overcome over a short distance, the attraction-flow volume is to be reduced or used for energy generation, fluctuating water levels occur, or ascent and descent are to be combined in one compact facility.

Depending on the version, different water-body sizes and head differences can be covered. The compact IPE version is especially suitable for smaller water bodies and head differences of up to about 4 metres. As standard, the DN version can be used for larger head differences of up to about 6 metres.

For requirements beyond this, special versions or several Fishcon locks arranged in series are possible, so that heads of well over 10 m can also be overcome.

The position of the entrances and exits is decisive for findability and thus for the biological function of the facility.

The tailwater-side entrance should be located as close as possible to the migration obstacle and in a flow area that is easy for the fish to find. A connection at the bank close to the main flow is recommended, for example, where the flow exits as parallel as possible to the main flow with a perceptible velocity.

The headwater-side connection should likewise be arranged as close as possible to the migration obstacle. Where possible, provisions can also be made to guide the fish towards this connection.

Fishcon is happy to work out the optimal integration together with the operator and the specialist planners involved.

Fishcon accompanies projects from the first site assessment through to commissioning. Depending on the project scope, this includes the technical design, support with permit planning, manufacturing, delivery, installation supervision and commissioning.

The earthworks, concrete works and hydraulic engineering works are usually carried out together with regional planning and construction partners.

For an initial technical assessment, the following information in particular is helpful:

  • Location and type of the transverse structure
  • Photos, plans and existing structural drawings
  • Head difference between headwater and tailwater
  • Discharge data (mean flow, design discharge …)
  • Relevant fish species

On this basis Fishcon can prepare an initial assessment of the suitable version and possible integration.

The costs depend on the requirements of the site and the required facility size. Key influencing factors are in particular the relevant fish species and their size, the head difference, the required attraction-flow volume and the chosen lock version.

Thanks to modular prefabrication and the low space requirement, construction and installation costs can often be significantly reduced compared with large-area conventional solutions.

After an initial review of the site data, Fishcon prepares a non-binding cost estimate or a project-specific offer.

At suitable sites the attraction-flow volume of the Fishcon lock can be used for energy generation via an integrated turbine. Whether this is economically worthwhile depends in particular on the individual conditions of the site.

Energy use can cover the facility’s own consumption and, beyond that, provide additional electrical energy. The technical and economic suitability is examined as part of a site-specific calculation.

Approval is always site- and country-specific. The Fishcon lock has already been used in several countries in projects approved under water law. Fishcon is happy to support operators and planners with the approval process.

The final approval decision lies with the respectively responsible authority.

Yes. The Fishcon lock is considered as a technical solution in the Austrian guideline for the construction of fish-ascent facilities and is classified as state of the art in some fish regions. For projects in other countries, the respectively applicable regulations and official requirements are taken into account when planning the Fishcon lock.

Construction and operation

The construction effort depends strongly on the site and on the existing structures. To estimate the effort, Fishcon is happy to assist with installation proposals or individual installation sketches.

Since the Fishcon lock is largely prefabricated in the factory, the lock module can be installed within a short time. However, the entire construction work at the site can take several days or weeks depending on the scope.

The Fishcon lock is largely prefabricated in the factory and then delivered to the site as a pre-assembled unit. Under suitable conditions, the mechanical installation of the lock module can be completed within one working day.

This must be distinguished from the preparatory construction work on site. The overall project duration therefore depends on the site and on the scope of the required work.

Yes. Thanks to its compact, modular design, the Fishcon lock is particularly suitable for retrofitting existing hydropower plants, flood-protection structures or other transverse barriers. It is precisely here that the compact design of our Fishcon lock and the associated flexibility are a great advantage.

The required attraction-flow volume is defined individually for each site. Decisive factors include, among others, the size of the water body, the competing discharge, the position of the entrance, the existing main flow and the requirements of the fish species present.

Our advantage: by throttling the discharge, the Fishcon lock can also be operated with comparatively low and, if necessary, variable water volumes.

The Fishcon lock is designed for low-maintenance operation. The large free cross-sections and the alternating flow reduce the risk of deposits and blockages.

Regular visual and functional inspections as well as one to two technical inspections per year are recommended. Among other things, the chambers, closure elements, drives, sensors, lighting, screens and the connections to the water body are checked.

The actual maintenance effort depends in particular on floating debris, bed-load transport, water-body type and the design of the inlet areas. A suitable diving wall, a coarse screen or other protective devices can reduce the effort.

A flood can be detected via dedicated sensors or via an external signal. When defined threshold values are reached, the Fishcon lock moves into a safe operating state and closes the closure elements.

This largely reduces the entry of floating debris and bed load into the chambers. In addition, the headwater and tailwater areas can be secured by covers, coarse screens or other protective measures.

The lock can be integrated into the structure in such a way that overflow during a flood is possible. After a flood a visual inspection is carried out; if necessary, the basins and chambers can be flushed or cleaned. The specific flood design is defined individually for each site.

Yes. The Fishcon lock can be used within the project-specifically defined operating limits with fluctuating headwater and tailwater levels.

The technical function can be monitored via the facility control system. For biological function checks, different monitoring methods can be used depending on the official requirements.

Company

Fishcon is active throughout the DACH region (Austria, Germany, Switzerland) and has already implemented Fishcon locks in Austria, Germany and Switzerland. In addition, projects in further European countries, in the USA and in Australia are being developed together with international partners.

For international projects Fishcon works together with regional planning, sales and implementation partners.

Fishcon combines scientifically tested technology with practical experience from completed facilities in several countries. From the first site assessment through planning and permit support to manufacturing, installation and commissioning, Fishcon accompanies projects holistically.

The technology was developed in cooperation with scientific institutions such as the University of Natural Resources and Life Sciences Vienna (BOKU) and Graz University of Technology and reviewed at various sites through biological monitoring studies. Together with experienced partner companies such as K. u. F. Drack GmbH & Co KG, Fishcon also has comprehensive expertise in the areas of hydraulic steel construction, hydropower, electrical engineering and plant construction.

Thanks to modular prefabrication, clear interfaces and cooperation with regional specialist partners, projects can be implemented efficiently and appropriately for the site.

In addition to the Fishcon lock, Fishcon also offers solutions in the area of fish protection and sustainable energy generation from hydropower. Together with our partner companies we can offer, among other things, engineering services, hydraulic steel construction, timber construction, electrical installations and plant control systems.

For information on currently available products and individual project solutions, please feel free to contact us.

You can reach Fishcon by phone at +43 650 9401368 or by e-mail at office@fishcon.at. For an initial project assessment, you are welcome to send us photos, plans and site details (head difference, mean flow, design discharge and the relevant fish species) as far as available.

We will get back to you as soon as possible.

Your site, our free feasibility check

We check your location free of charge and without obligation and answer all open questions personally.