Fishcon lock Trackermühl Weir

Ensuring longitudinal connectivity is often a major challenge for owners of instream barriers. In addition to costs, space and water requirements, as well as integration into the landscape, on-site implementation is frequently demanding.

Recently, FISHCON together with KFD was able to impressively demonstrate that the Fishcon lock offers numerous advantages in this regard. In November, the Fishcon lock was installed at the Trackermühl weir on the Alm River in just seven days. The facility was completely embedded into the ground, meaning that the landscape appearance is hardly affected, unrestricted accessibility is maintained, and the system is well protected against flooding. Due to the low space requirements, no trees had to be removed and construction effort was minimal. Although the Fishcon lock operates with only 100 l/s (60% less than a vertical slot fish pass in the respective fish region), a large number of fish ascents were already recorded during the first few days of operation.

FISHCON would be pleased to assess the potential application at your site!

Your site, our free feasibility check

We check your location free of charge and without obligation and answer all open questions personally.